Decree No. 371 / 2024 Coll.

Decree amending Decree No. 79 / 2022 Coll., on Technical and Economic Parameters for the determination of reference ransom prices and green bonuses and implementing certain other provisions of the Act on Supported Energy Sources (Technical and Economic Parameters Order), as amended by Decree No. 275 / 2023 Coll.

Valid Order Effective from 01.01.2025
Contents
371
DECLARATION
of 3 December 2024
amending Decree No 79 / 2022 Coll., on technical and economic parameters for the determination of reference ransom prices and green bonuses and implementing certain other provisions of the Act on Supported Energy Sources (Technical and Economic Parameters), as amended by Decree No 275 / 2023 Coll.
According to Article 53 (2) (a), (b) and (l) of Act No. 165 / 2012 Coll., on Supported Energy Sources and on the Amendment of Certain Acts, as amended by Act No. 131 / 2015 Coll. and Act No. 382 / 2021 Coll.:
Čl. I
Decree No. 79 / 2022 Coll., on Technical and Economic Parameters for the Determination of Reference Ranking Prices and Green Bonus and on the implementation of certain other provisions of the Act on Supported Energy Sources (Technical and Economic Parameters Order), as amended by Decree No. 275 / 2023 Coll., is amended as follows:
1. In Section 4, "6,12 'is replaced by" 6,21';
2. In Annex 1, Table 1, including the title, reads:
"Table 1 - Technico-economic parameters for setting the reference purchase price and green bonus for electricity, heat and biomethane production plants and their lifetime
Výrobna / instalovaný výkonStav1Doba životnostiDoba ročního využití instalovaného výkonuMěrné investiční nákladyNáklady na pořízení paliva
roky/hod.hodnotajednotkahodnotajednotkahodnotajednotka
ř./sl.abcdefghi
1Malá vodní elektrárna nižší než 1 MWeNová20 let4 000kWhe/kWe204 800Kč/kWeXX
2Modernizovaná20 let4 000kWhe/kWe102 400Kč/kWeXX
3Větrná elektrárna nižší než 6 MWeNová20 let2 250kWhe/kWe58 700Kč/kWeXX
4Modernizovaná20 let2 250kWhe/kWe55 400Kč/kWeXX
5Biomasa – elektřina nižší než 1 MWeModernizovaná20 let5 000kWhe/kWe108 500Kč/kWekategorie biomasy
1,2 – 210
3 – 50
ZEVO6 – 0
Kč/GJ
6Biomasa teplárna – teplo nad 200 kWtNová20 let3 000kWht/kWt36 500Kč/kWtKč/GJ
7Biomasa výtopna – teplo nad 200 kWtNová20 let3 000kWht/kWt21 900Kč/kWtKč/GJ
8Bioplyn (BPS4) – elektřina nižší než 1 MWeModernizovaná20 let7 500kWhe/kWe85 000Kč/kWe4,1Kč/Nm3 bpl
9Skládkový plyn / Kalový plyn – elektřina nižší než 1 MWeNová15 let5 500kWhe/kWe44 400Kč/kWe0,5*X̅2Kč/kWh
10Modernizovaná15 let5 500kWhe/kWe36 400Kč/kWe0,5*X̅2Kč/kWh
11Biometan – bioplyn z BPS4 bez omezeníNová20 let8 000hod.365 300Kč/Nm3 bpl3,5Kč/Nm3 bpl
12Konverze, čištění720 let8 000hod.260 100Kč/Nm3 bpl3,5Kč/Nm3 bpl
13Biometan – skládkový plyn / kalový plyn bez omezeníNová, konverze, čištění20 let8 000hod.152 800Kč/Nm3 bpl0,5*5,2*X̅2Kč/Nm3 bpl
14Důlní plyn (činný) – elektřina bez omezeníModernizovaná15 let8 000kWhe/kWe36 400Kč/kWe0,5*X̅2Kč/kWh
15Důlní plyn (uzavřený) – elektřina bez omezeníModernizovaná15 let8 000kWhe/kWe36 400Kč/kWe1,0*X̅2Kč/kWh
16KVET5 – elektřina do 50 kWe včetněNová15 let6 000kWhe/kWe90 000Kč/kWeZPcena3Kč/kWh
17Modernizovaná15 let6 000kWhe/kWe72 000Kč/kWeZPcena3Kč/kWh
18KVET5 – elektřina nad 50 kWe a současně do 200 kWe včetněNová15 let3 300kWhe/kWe60 000Kč/kWeZPcena3Kč/kWh
19Modernizovaná15 let3 300kWhe/kWe48 000Kč/kWeZPcena3Kč/kWh
20KVET5 – elektřina nad 200 kWe a současně nižší než 1 MWeNová15 let3 300kWhe/kWe40 000Kč/kWeZPcena3Kč/kWh
21Modernizovaná15 let3 300kWhe/kWe32 000Kč/kWeZPcena3Kč/kWh
“.
3. In Annex 1 to Explanatory Note 1 under Table 1, the number "2024 'is replaced by" 2025'.
4. Annex 3, including footnote 2, reads:

"Annex No 3
Method of creating equivalent heat price to determine the maintenance support of heat using geothermal energy
The equivalent heat price is derived from the reference price of heat produced in a natural gas boiler with an installed output of 1 MWt. The price is determined as the sum of fuel costs, operating costs, investment costs and reasonable profit according to the formula
ECTE = ZPcenaηPK3.6 + OÚ + INVPKDZ * RVT + INVPK * ROARVT
where
ECTE [CZK / GJ] is the equivalent price of heat,
Paid [CZK / MWh] is the price of natural gas (in calorific value) according to the formula
Priced = price-regulated + commodity price,
where
the price-regulated [CZK / MWh] is the price of the related gas service determined from the average prices of the distribution system service of regional distribution system operators, which includes the price for the activities of the market operator including the fee for the activities of the Office; the prices of the distribution system service are determined in accordance with the price ratio of the regulated gas supply prices of the Authority in the year in which the maintenance heat support is determined;
the price of the commodities [CZK / MWh] is the arithmetic average of the available final prices (settlement price) of EEX-THE Cal-YY for the period January to June of the calendar year in which the maintenance heat support is determined, plus EUR 4 / MWh to take into account the reasonable sales costs of the trader,
η PK [-] is the reference efficiency of a natural gas boiler, determined in accordance with the directly applicable European Union Regulation, reviewing the harmonised efficiency reference values for the separate production of electricity and heat 2), of 0,92,
OÚ [CZK / GJ] are the costs of repair and maintenance of the boiler in the amount of 16 CZK / GJ,
INVPK [CZK] is the reference value of the investment in the gas boiler in the amount of CZK 5 500 000,
DJ [years] is the life of the boiler set for 15 years,
RVT [GJ] is the annual heat production of the boiler of 11 880 GJ,
ROA [-] is the rate of return determined according to the Office's price scale for thermal energy prices effective in the year in which the maintenance heat support is determined.
(2) Commission Delegated Regulation (EU) 2015 / 2402 of 12 October 2015 reviewing harmonised efficiency reference values for separate generation of electricity and heat in application of Directive 2012 / 27 / EU of the European Parliament and of the Council and repealing Commission Implementing Decision 2011 / 877 / EU, as amended. ';
Čl. II
Transitional provision
For electricity, heat and biomethane plants put into service or upgraded from 1 January 2024 to 31 December 2024, the technical and economic parameters referred to in Decree No 79 / 2022 Coll., as effective before the date of entry into force of this Decree, shall apply.
Čl. III
Efficacy
This Decree shall take effect on 1 January 2025.
Council President:
Zavíček, Ph.D., v. r. o.

Sign in for notes, favorites and notifications

Rating:

Comments 0

To write comments, please sign in.

Regulation Information

CitationDecree No. 371 / 2024 Coll., amending Decree No. 79 / 2022 Coll., on Technical and Economic Parameters for the Determination of Reference Ranking Prices and Green Bonus and implementing certain other provisions of the Act on Supported Energy Sources (Order on Technical and Economic Parameters), as amended by Decree No. 275 / 2023 Coll.
Regulation TypeOrder
Author-
CollectionCode of Laws
Date of Promulgation09.12.2024
Effective from01.01.2025
Effective until-
Status Valid
The regulation text is for informational purposes only.
Favorites
Browsing History