Decree No. 338 / 2011 Coll.

Decree amending Decree No. 475 / 2005 Coll., implementing certain provisions of the Act on the Promotion of the Use of Renewable Resources, as amended

Valid Order Effective from 23.11.2011
Text versions: 23.11.2011
Contents
338
DECLARATION
of 16 November 2011
amending Decree No. 475 / 2005 Coll., implementing certain provisions of the Act on the Promotion of the Use of Renewable Resources, as amended
According to Section 12 (3) of Act No. 180 / 2005 Coll., on the promotion of the production of electricity from renewable energy sources and on the amendment of certain laws (Act on the Promotion of the Use of Renewable Resources), for the implementation of Section 6 (1) (b) (1) of the Act on the Promotion of the Use of Renewable Resources:
Čl. I
Annex 3 to Decree No. 475 / 2005 Coll., implementing certain provisions of the Act on the Promotion of the Use of Renewable Resources, as amended by Decree No. 364 / 2007 Coll., Decree No. 409 / 2009 Coll. and Decree No. 300 / 2010 Coll., reads:

"Annex No 3 to Decree No 475 / 2005 Coll.
Indicative values of technical and economic parameters
Water energy - Water power plants
1. Expected lifetime of the new plant: 30 years.
2. Requirement for the efficiency of primary energy use: The efficiency of the newly installed turbine is assumed to be at operating optimum ≥ 85% (measured on turbine coupling), for renovation of older types ≥ 80%.
3. Measuring investment costs and annual use of installed power:
Celkové měrné investiční náklady
[Kč/kWe]
Roční využití instalovaného výkonu
[kWh/kWe]
< 145 000> 4 000
Biomass
1. Expected lifetime of the new plant: 20 years.
2. Requirement for the efficiency of primary energy use: For the production of combustion biomass for electricity generation, the economically rational use of waste heat is assumed.
3. Measuring investment costs and annual use of installed power:
Charakteristika výrobnyCelkové měrné investiční náklady
[Kč/kWe]
Roční využití instalovaného výkonu
[kWh/kWe]
Zdroj spalující čistou biomasu< 75 000> 5 000
Zdroj spalující (samostatně) plyn ze zplyňování pevné biomasy< 75 000> 5 000
Note: Total specific investment costs - Total specific investment costs related to installed electrical power
The indicative parameters for biomass energy are based on biomass prices in 2011 at a normal level corresponding to its quality and quantity.
Biogas, landfill gas, sludge and mining gas from closed mines
1. The expected lifetime of the new plant burning landfill, sludge or mining gas for 15 years, and the biogas combustion plant 20 years.
2. Requirement for the efficiency of the use of primary energy content: For the production of combustion biogas for electricity generation, a rational use of waste heat is expected.
3. Measuring investment costs and annual use of installed power:
Charakteristika výrobnyCelkové měrné investiční náklady
[Kč/kWe]
Roční využití instalovaného výkonu
[kWh/kWe]
Výrobny spalující skládkový plyn, kalový plyn< 50 000> 7 000
Výrobny spalující bioplyn včetně nové technologie produkce bioplynu< 100 000> 7 500
Výrobny spalující důlní plyn z uzavřených dolů< 50 000> 7 000
Wind energy - Wind power plants
1. Expected lifetime of the new plant: 20 years.
2. Requirement for efficiency of primary energy use: Annual average wind speed at the wind power plant site at the height of the rotor of the proposed power plant is assumed to be ≥ 6 m / s
3. Measuring investment costs and annual use of the output of the installed resource:
Celkové měrné investiční náklady
[Kč/kWe]
Roční využití instalovaného výkonu
[kWh/kWe]
< 42 000> 2 100
Geothermal energy - use of low potential heat
1. Expected lifetime of the new plant: 20 years.
2. Required efficiency of primary energy use: The energy potential of the geothermal energy source is assumed to be at least such that it can be permanently obtained by means of a heat transfer medium at a minimum thermal gain of 50 to 70 litres of water per second at a temperature of > 95 ° C per megawatt of the installed electrical power of the source.
3. Measuring investment costs and annual use of the output of the installed resource:
Celkové měrné investiční náklady včetně vrtů [Kč/kWe]Roční využití instalovaného výkonu
[kWh/kWe]
< 275 000> 5 700
Photovoltaic
1. Expected lifetime of the new plant: 20 years.
2. Requirement for the efficiency of primary energy use: The design and location of photovoltaic cells is envisaged to achieve annual terminal electricity production ≥ 150 kWh per square metre of active solar panel area. At the same time, a decrease in panel power of 0,8% of nominal output per year is expected.
3. Measuring investment costs and annual use of the output of the installed resource:
Charakteristika výrobnyCelkové měrné investiční náklady
[Kč/kWp]
Roční využití instalovaného špičkového výkonu
[kWh/kWp]
Do 30 kWp včetně< 60 000> 980
Note kWp expresses the peak electric power unit of the solar panel available under the given reference conditions'.
Čl. II
Transitional provision
The indicative values of the technical and economic parameters referred to in Annex 3 to Decree No. 475 / 2005 Coll., implementing certain provisions of the Act on the Promotion of the Use of Renewable Resources, as effective by the date of entry into force of this Decree, apply to the plants put into service by the date of entry into force of this Decree.
Čl. III
Efficacy
This decree shall take effect on the day of its publication.
President:
Ing. Vitásková v. r.

Sign in for notes, favorites and notifications

Rating:

Comments 0

To write comments, please sign in.

Regulation Information

CitationDecree No. 338 / 2011 Coll., amending Decree No. 475 / 2005 Coll., implementing certain provisions of the Act on the Promotion of the Use of Renewable Resources, as amended
Regulation TypeOrder
Author-
CollectionCode of Laws
Date of Promulgation23.11.2011
Effective from23.11.2011
Effective until-
Status Valid
The regulation text is for informational purposes only.