Decree No. 248 / 2024 Coll.
Decree amending Decree No. 16 / 2016 Coll., on the Conditions for Connection to the Electricity System, as amended by Decree No. 487 / 2021 Coll.
Valid
Order
Effective from 01.10.2024
248
DECLARATION
of 14 August 2024
amending Decree No 16 / 2016 Coll., on the conditions for connection to the electricity system, as amended by Decree No 487 / 2021 Coll.
Pursuant to Section 98a (2) (g) of Act No. 458 / 2000 Coll., on the Terms and Conditions of Business and on the Performance of State Administration in the Energy Sector and on the Amendment of Certain Laws (Energy Act), as amended by Act No. 158 / 2009 Coll., Act No. 211 / 2011 Coll., Act No. 382 / 2021 Coll. and Act No. 469 / 2023 Coll.:
Decree No. 16 / 2016 Coll., on the Conditions of Connection to the Electricity System, as amended by Decree No. 487 / 2021 Coll., is amended as follows:
1. in Paragraph 2 (d), "10" is replaced by "10,8."
2. In Article 3, at the end of paragraph 2, the dot is replaced by a comma and the following point (h) is added:
"(h) the connection of the production plant pursuant to the second sentence of Paragraph 28 (5) of the Energy Act by a notification (hereinafter referred to as" notified connection of the production plant to the distribution system ") pursuant to Section 16a. '
3. In Article 3, at the end of paragraph 3, the words "1,2 times the installed power of all the production facilities connected at a given connection point 'are replaced by the words" a summary of the installed power of all the power modules connected at a given connection point, namely the installed power of non-synchronous power modules and 1,2 times the installed power of synchronous power modules'.
4. In the second sentence of Article 3 (4), the word "power 'is replaced by" power'.
7. In Paragraph 8 (1), the words "and the economy of system development and operation 'shall be added at the end of the text in point (e).
9. Paragraph 8 (5) reads as follows:
"(5) If the installation of the applicant cannot be connected for reasons specified by the Energy Act), the transmission system operator or distribution system operator shall notify the applicant in writing of this fact in the case of a device connected to the voltage level of low voltage within 30 days or in the case of a device connected to the voltage level of high or very high voltage within 60 days, or in the case of a device connected to the transmission system within 90 days of the submission of a complete request for connection or from the date of transmission of the study of the appendability, where the processing of the study has been requested. The transmission system operator or distribution system operator shall at the same time state the specific reasons for which the applicant's installation cannot be connected and shall indicate the provisional date and the preconditions for future connection. ';
11. in Article 8, the following paragraphs 6 and 7 are inserted after paragraph 5, including footnote 8:
"(6) Where, in the case referred to in paragraph 5, the applicant may be connected by:
(a) under other conditions,
(b) less than the required power or power; or
(c) providing the technical equipment requirements of the data transmission plant and the restriction of active power supply by the transmission system operator or distribution system operator, with the possibility of limiting the use of the reserved power without compensation for such limitation in preventing or addressing overloads in the system (8);
the transmission system operator or distribution system operator shall inform the applicant in writing, at the same time as the reasons referred to in paragraph 5 for which the installation cannot be connected under the required conditions, within the time limit referred to in paragraph 5; the transmission system operator or distribution system operator shall communicate all possible connections referred to in points (a), (b) or (c) where the applicant's facilities can be connected in such a way.
(7) If, within 20 days of the communication by the TSO or distribution system operator referred to in paragraph 6, the applicant confirms in writing one of the possible connections referred to in paragraph 6 (a), (b) or (c), the TSO shall submit a draft contract to the applicant within 25 working days or the distribution system operator shall submit a draft contract within 15 working days; where it is possible to connect applicants at multiple connection points, they shall submit a draft contract only if the applicant confirms the connection at one of those connection points within 20 days of the communication of the transmission system operator or distribution system operator.
8) Articles 24 (12) and 25 (13) of the Energy Act. '
Paragraph 6 shall become paragraph 8.
12. in Article 8 (8), the words "or 5" are replaced by the words "to 7 and Article 6 (5)";
14. in Paragraph 9 (1):
"(1) The transmission system operator or distribution system operator shall determine the connection point, the connection method, including the determination of the voltage level, the connection deadline and other connection conditions, so that the specified connection conditions are based on the connection request, the planned network development and the principle of system development and operation, taking into account the applicant's interest in minimising the connection costs of the transmission system or distribution system. ';
15. The following Section 9a is inserted after Section 9, including footnote 9:
(1) If the installation has not been connected for reasons specified by the Energy Act) and these reasons have ceased, the transmission system operator or distribution system operator shall communicate this fact to the applicant to whom it has communicated the facts referred to in Article 8 (5) in the previous 5 years.
(2) If the reasons for the connection of an installation pursuant to Article 8 (6) (b) or (c) have ceased, the transmission system operator or distribution system operator shall communicate this to the person with whom the connection agreement has been concluded in the previous 5 years on the basis of the submitted proposal pursuant to Article 8 (7).
(3) The communication referred to in paragraphs 1 to 3 shall not be provided by the distribution system operator, if the interactive map 9 is published) on the free distribution capacity for a voltage level of very high and high voltage and the free capacity of electrical stations or free capacity at a specific demand point at a voltage level of low voltage in the distribution system operated by it.
9) Paragraph 25 (11) (m) of the Energy Act. '
16. in Paragraph 13 (2):
"(2) The reserve power or power may be transferred only if technically possible and the execution of the transfer of the reserved power or power does not entail additional costs related to the acquisition, construction or modification of the transmission or distribution system. ';
17. In Paragraph 13, the following paragraphs 3 and 4 are inserted after paragraph 2:
"(3) The transfer referred to in paragraph 2 may take place:
(a) on a low voltage level only between the points of connection of equipment connected from one transformer with a high voltage to low voltage transformation;
(b) on a high voltage level only between the points of connection of equipment connected from one transformer with a transformation from a very high voltage to a high voltage;
(c) at a very high voltage level only between the connection points of the equipment connected from one node station providing connection between the transmission system and the distribution system;
(d) in the transmission system, only between the connection points of equipment connected from one electrical station and, in the case of distribution systems, between the connection points of distribution systems within a single node area.
(4) Only reserved power or power of already connected equipment may be used to transfer the reserved power or power referred to in paragraphs 2 and 3. Paragraph 10 shall not apply. '.
Paragraph 3 shall become paragraph 5.
18. In Article 15 (1), the words "and microdroid 'are deleted.
19. In Article 16, at the end of paragraph 2, the dot is replaced by a comma and the following point (e) is added:
"(e) the sum of the installed power of all microseparators connected at the sampling point by a simplified connection shall not exceed 10,8 kW."
21. the following Section 16a is inserted after Section 16, including the title and footnote 10:
Conditions for the notified connection of a product to a distribution system
(1) The notification of the intention to connect the plant pursuant to the second sentence of Paragraph 28 (5) of the Energy Act shall be submitted by the customer to the distribution system operator with whom the connection contract is concluded to electronic contact designated by the distribution system operator in a way that allows remote access.
(2) The notification shall include at least:
(a) the consent of the owner of the property to the location of the building on its property; and
(b) evidence of the technical solution of the plant, showing that the customer meets the connection conditions and technical conditions laid down in the Rules on the operation of the distribution system (hereinafter referred to as "proof of compliance with the technical connection conditions laid down by the distribution system operator") and the directly applicable European Union10 Regulation).
(3) Where, within 30 days of the submission of the notification by the customer, the distribution system operator does not refuse connection for reasons laid down by the Energy Act for which the applicant's installation cannot be connected to the distribution system 3), the change in the content of the connection contract commitment shall be confirmed to the client without undue delay by submitting to the client a draft connection agreement or a proposal to amend the existing connection contract.
(10) Commission Regulation (EU) 2016 / 631 of 14 April 2016 establishing a network code for requirements for the connection of production facilities to the electricity system. ';
22. Annex 8 shall read as follows:
"Annex No 8
The total amount of eligible own funds to meet MCR calculated considering technical provisions without transitional measures.
| ZA REZERVACI PŘÍKONU | ||
|---|---|---|
| Místo připojení k napěťové hladině | Způsob připojení | Měrný podíl žadatele |
| přenosová soustava | v místě připojení podle stanoviska provozovatele přenosové soustavy | 300 000 Kč/MW |
| distribuční soustava VVN | Typ A | 920 000 Kč/MW |
| distribuční soustava VVN | Typ B | 220 000 Kč/MW |
| distribuční soustava VN | Typ A | 1 220 000 Kč/MW |
| distribuční soustava VN | Typ B | 300 000 Kč/MW |
| distribuční soustava NN | 3 fázové připojení | 770 Kč/A |
| distribuční soustava NN | 1 fázové připojení | 300 Kč/A |
| ZA REZERVACI VÝKONU | ||
|---|---|---|
| Místo připojení k napěťové hladině | Způsob připojení | Měrný podíl žadatele |
| přenosová soustava | v místě připojení podle stanoviska provozovatele přenosové soustavy | 760 000 Kč/MW |
| distribuční soustava VVN | Typ A | 1 840 000 Kč/MW |
| distribuční soustava VVN | Typ B | 220 000 Kč/MW |
| distribuční soustava VN | Typ A | 980 000 Kč/MW |
| distribuční soustava VN | Typ B | 220 000 Kč/MW |
| distribuční soustava NN | 3 fázové připojení | 770 Kč/A |
| distribuční soustava NN | 1 fázové připojení | 300 Kč/A |
Type Connection A is such a connection where the distribution system operator expands the distribution system to the point of the applicant's facility by the management or, where appropriate, the distribution plant or part of the distribution plant.
The method of connection of Type A1 shall be such that the distribution system operator expands the distribution system by a line or, where applicable, a distribution station or part of a distribution station to a location other than that of the applicant's installation and is not a type A2 connection. In such a case, the applicant's average share shall be 70% of that for type A connection.
The method of connection of Type A2 is such a connection where the distribution system operator connects the applicant's equipment into the grid of a distribution system of very high voltage or high voltage. In this case, the applicant's average share shall be 30% of that for type A connection.
The type B connection method is such a connection that does not meet the conditions of the type A, A1 or A2 connections.
In the case of a degraded reservation of power or power for an applicant's installation already connected to the distribution system, or in the case of an application for an increase of the reserved power or power, the current method of connecting the applicant's equipment, assessed under this Order, shall apply to determine the amount of the applicant's share of the eligible costs even if the extension of the distribution system took place before the expiry of this decree. ';
Transitional provision
The request for connection, the request for the conclusion of the connection contract or the request for modification of the connection contract submitted before the date of entry into force of this decree shall be assessed in accordance with Decree No. 16 / 2016 Coll., as effective before the date of entry into force of this decree.
Efficacy
This Decree shall take effect on 1 October 2024, with the exception of Article I (5), (6), (8), (10), (13) and (20), which shall take effect on 1 April 2026.
Council President:
Zavíček, Ph.D., v. r. o.
Sign in for notes, favorites and notifications
Regulation Information
| Citation | Decree No. 248 / 2024 Coll., amending Decree No. 16 / 2016 Coll., on the conditions for connection to the electricity system, as amended by Decree No. 487 / 2021 Coll. |
|---|---|
| Regulation Type | Order |
| Author | - |
| Collection | Code of Laws |
| Date of Promulgation | 22.08.2024 |
|---|---|
| Effective from | 01.10.2024 |
| Effective until | - |
| Status | Valid |
The regulation text is for informational purposes only.
Comments 0